Skip to main content Scroll Top

Web Design in El Paso for a Supplier Whose Buyers Changed Products

Updated November 2026 · Written and maintained by the Progression Agency strategy team

A supplier in East El Paso built its website to sell tooling to wire harness lines, and the plant across the bridge that used to order those parts is now putting together electronics for data centers. Web design in El Paso, for a company like that, starts with the machine list. The Federal Reserve Bank of Dallas reported in April 2026 that Juarez lost about 57,500 factory jobs in two years even as its plant count held steady, a sign of work changing rather than leaving. This page turns a machine list into pages a buyer can use, and gives the cost. Progression is based in New York, works with El Paso companies remotely, and offers on-site sessions on request.

On this page · 11 sections
  1. A harness shop that makes something else now
  2. Web design in El Paso starts from the floor list
  3. From machine list to page line
  4. What a supplier site costs in El Paso
  5. Two readers of the same page
  6. Origin lines on a supplier page
  7. Web design in El Paso, Texas beyond the bridges
  8. What does the old site say that is no longer true?
  9. Who approves a capability claim?
  10. A brief for a supplier rebuild
  11. Related services and guides

Outside the niche A company in El Paso that sells to shoppers rather than to plants can take one line from this: your site should describe what you sell this year, not what you sold when the site was built. Our website design and development page explains the general service.

Employment figures are the Federal Reserve Bank of Dallas’s, from its April 8, 2026 article, and are stated with their dates. This page forecasts nothing about any plant, supplier or trade rule. Nothing here is customs or legal advice, so ask a customs broker or counsel. No company named or implied here is a Progression client.

A harness shop that makes something else now

In 2023 the shop built wire harnesses, and its website said so in the banner. This year the work is rack cabling, enclosure assembly and test for server hardware, and the site has not caught up.

A drawn card comparing a website banner from 2023, wire harness assemblies for automotive lines, with a floor list today of rack and enclosure assembly, cable builds and test, and a blank line for what the site says about the new work.A drawn card comparing a website banner from 2023, wire harness assemblies for automotive lines, with a floor list today of rack and enclosure assembly, cable builds and test, and a blank line for what the site says about the new work.
The site still talks about the old work. The floor list is where the rewrite starts.

The example is made up, and the gap is common. A buyer who searches for the new work lands on a page that talks about the old work, and leaves. Everything below is meant to close that gap, starting from what is on the floor.

Web design in El Paso starts from the floor list

The Federal Reserve Bank of Dallas published an article on April 8, 2026, “Ciudad Juarez retools amid job losses,” by Isabel Brizuela, Jesus Cañas, Luis Torres and Diego Morales-Burnett. It says Ciudad Juarez, directly across the border from El Paso, shed approximately 57,500 maquiladora jobs from mid-2023 to mid-2025, an 18 percent loss of manufacturing workers, and that employment fell from 317,000 workers in August 2023 to 259,500 by August 2025.

Bar chart of Juarez maquiladora employment: 317,000 workers in August 2023 and 259,500 workers in August 2025.Bar chart of Juarez maquiladora employment: 317,000 workers in August 2023 and 259,500 workers in August 2025.
Both bars start at zero. Figures are the Federal Reserve Bank of Dallas’s.

The article adds that transportation manufacturing employed nearly one third of the city’s maquiladora workforce in mid-2023, that the number of maquiladoras has remained steady or even increased in some sectors, and that Juarez is seeing strong growth in electrical equipment, driven by medical device and electronics operations. The authors read the decline as a move toward higher value-added production, including electronics and hardware for the U.S. data center build-out.

For a supplier, the plain meaning is that the buyer is still there and is buying different things. This page makes no forecast. It shows how to describe today’s capabilities in the words a buyer of the new work would search for.

What does a supplier site have to say first?

What you make now, for whom, to what size and limit. The history can follow.

  • Lead with current work, in the buyer’s vocabulary.
  • Name each capability once, on its own page.
  • Show limits as numbers: sizes, tolerances, volumes.
  • Put the contact on every page.

From machine list to page line

Take the floor list and turn each line into a line on a page. The table covers eight common pieces of equipment and capability. Replace them with your own, and keep the four columns.

Machine list to page line
Machine or capabilityWhat it doesWhat a buyer of electronics work needs to seeThe page line
SMT linePlaces surface mount parts on boardsBoard sizes, part sizes, volumes and how the line is inspectedSurface mount assembly, with board size and volume limits
Wave solderSolders through-hole parts in one passWhich board types it handles and the process controlsThrough-hole soldering for boards up to a stated size
Press brakeBends sheet metalMaterial, thickness and length limitsSheet metal bending for enclosures and brackets
CNC millCuts metal and plastic parts to a drawingPart envelope, materials and tolerancesMachined parts to drawing, with envelope and tolerance
Cable assembly benchBuilds cables and harnessesConnector types, lengths and test methodCustom cable and harness assembly
ESD flooringControls static in the work areaThat the area exists and how it is checkedStatic controlled assembly area
Test stationChecks assemblies against a specificationWhat is tested, how it is recorded and what a buyer receivesFunctional test with records on request
Cleanroom benchProvides a controlled area for sensitive assemblyThe class of the room, only if it is certifiedControlled area assembly, with the class stated only if certified

Cable assembly: the capability that crosses over

A shop that built harnesses for vehicles already has the skills for cables and harnesses in racks and enclosures. The page line should say so in the new vocabulary: connector types, lengths, test method. Keep the old automotive projects on a dated history page, so the buyer of the new work sees the new work first.

Test and inspection: the part a data center buyer asks about first

A buyer sending out electronics work wants to know how each assembly is checked and what record comes back. Describe the test, the record and the way a buyer asks for it. If you hold a certification, name it with its number and date, and say nothing about one you do not hold.

Name: The capability, by name. The words a buyer types, not an internal job code.
Does: What it does. One plain sentence on the work, with sizes and limits.
Proof: What proves it. A photo, a certificate number or a dated project, if you hold one.
Fit: Who it fits. The kind of product or buyer the capability serves.
Ask: What to send. The drawing, file or spec the buyer should attach to a request.
Next: The next step. One contact, one form and a plain promise of when you reply.

The cards give the six lines every capability page needs. A page with all six answers a buyer’s first message before it is written.

What a supplier site costs in El Paso

Website design in El Paso for a supplier costs what the scope costs. A site with one page per capability and a request form is a smaller project than one with a parts catalog, a quote engine and a customer portal. The bands below show where the market sits.

Bands for a supplier site

The bands run from the typical low to the published high for each kind of site.

These are published US price bands (market figures, not a Progression rate card).
What is quotedPublished US bandFits
Brochure or small business site$3,000 to $25,000A shop with one page per capability and a request form
Custom business site$15,000 to $100,000A supplier with many capabilities, downloads and a larger content plan
Ecommerce site$5,000 to $100,000Standard parts sold by catalog number
Landing page$1,000 to $15,000One capability, one campaign
Maintenance$100 to $2,500 a monthUpdates, fixes and monitoring
Accessibility audit and remediation$1,500 to $7,500Bringing an existing site up to standard

Progression list prices for a supplier site

These are the fixed-scope prices on our website design and development page, each a starting price. We publish no price per machine.

Progression fixed-scope prices, price from
Build typePrice from
Single landing page$1,400
Brochure site, 5 to 8 pages$9,500
Business site, 10 to 16 pages$18,000
Site plus content program, 30 to 60 pages$36,000
Ecommerce, under 200 SKUs$34,000
Ecommerce with integrations$78,000
Accessibility remediation$4,000

Two readers of the same page

A supplier’s page usually has two readers: a purchasing manager in the United States who compares quotes, and a plant engineer across the bridge who checks whether the part will fit. They want different things from the same page.

  • The purchasing manager looks for capability, location, certifications and a way to ask for a quote.
  • The plant engineer looks for limits, materials, drawings and test records.
  • Both want one clear contact and a short answer time.
Two readers, line by line
Question on the pageThe purchasing manager wantsThe plant engineer wants
Can you make it?A capability summary in one sentenceLimits as numbers: size, material, tolerance
Can I trust it?Certifications named with number and dateTest method and the record that comes back
How do I ask?A request form and a named contactA place to attach a drawing or file
When will I hear back?A stated reply timeA direct line to someone who reads drawings

How many pages does an eight line machine list need?

Usually four to six. Sort machines by what a buyer searches for: assembly, sheet metal, machining, cable work and test. Each set gets a page that names its machines inside it.

Should a page lead with the machine or the product?

The product or the job the buyer needs done. Machines go in the detail, where an engineer will look for them.

  • Start each page with the job, then the equipment.
  • Use the buyer’s term for the part, not the shop’s nickname.
  • Link each capability page to the test and inspection page.
  • Put one photo of the real work beside each page’s summary.
  • Keep the request form short: part, quantity, drawing, date needed.
  • Say what you do not make, in plain words, so buyers do not waste a message.

Serve both with one site and clear pages: a short capability summary on top and the detail underneath. Ask your own buyers which language and format their engineers prefer before you decide anything about translation. Our web design in Houston page shows how another Texas supplier market is handled.

Origin lines on a supplier page

The Dallas Fed notes that maquiladoras can import raw materials, components and equipment duty free, that duties typically apply only to the value added on products sent back to the U.S., and that under USMCA additional tariffs may apply if manufacturing components do not meet rules of origin.

A supplier page should not state how any part is treated. Say where the work is done and what you can document, and leave tariff treatment to a customs broker. Never write that a part qualifies under USMCA unless a broker has said so for that part.

  • State where each process is done.
  • Keep documents available on request.
  • Leave duty and tariff statements to a broker.
  • Record who approved each origin line.

Got a machine list?Send your machine list, even a spreadsheet. You get a free proposal for web design in El Paso with the new capability pages listed.

Get a free proposal

Web design in El Paso, Texas beyond the bridges

The same Dallas Fed article says thriving Juarez plants create service sector jobs across the border in transportation, real estate and professional services. A freight forwarder, an industrial real estate broker or an accountant in El Paso also sells to the plants’ needs.

Their sites work the same way: begin with what the firm does this year, for which buyer. Our website design and development page covers the general service for any of them.

What does the old site say that is no longer true?

Start there. Read every page as a buyer of the new work would, and mark each sentence that describes work you no longer do, volumes you no longer run or equipment you have replaced.

Dated: Projects with dates. Keep what is still true and show the year.
Gone: Work you no longer do. Remove it or move it to a clearly labeled history.
New: Work you do now. Add it first, above the older material.
Claims: Capability claims. Each approved by a named person before it goes live.
Photos: Floor photos. Current, with permission, and without customer marks.
Links: Old addresses. Kept working and pointed to the page that replaced them.

The cards give a way to sort what you find. Keep dated projects, retire old claims and put current work first.

  • Open the live site on a phone and read it aloud.
  • Mark every sentence about work you no longer do.
  • List every page that links to the old work.
  • Decide, page by page: keep, date, move or retire.
  • Check that old addresses still lead somewhere useful.

Why does a stale page cost a supplier orders?

Because a buyer searching for the new work meets a page about something else and moves on without a message. Nothing in the inbox tells you it happened.

Do I need a separate page for each machine?

No. A page for each capability a buyer searches for, not each machine. Three presses that bend sheet metal are one page.

Who approves a capability claim?

A named person, before the page goes live. The quality manager or the plant lead signs each claim: a size, a tolerance, a class, a certification. A claim that no one approved is a claim that can embarrass the company in an audit.

  • List every claim on the page with its approver.
  • Date the approval.
  • Review again when equipment changes.

A brief for a supplier rebuild

Copy the card into a document and fill it in. It is the quickest way to move from a floor list to a scope.

A drawn brief card with five blank lines: the floor list, what changed since 2023, the top three buyers' products, who approves capability claims, and what the old site says that is no longer true.A drawn brief card with five blank lines: the floor list, what changed since 2023, the top three buyers' products, who approves capability claims, and what the old site says that is no longer true.
Five lines are enough to start a written scope.

Send the filled card with your machine list. Our manufacturing branding page covers the identity side of the same work.

Pages that sit beside this machine list:

Get a free proposal

Send your machine list, even a spreadsheet. You get a free proposal for web design in El Paso with the new capability pages listed.

Get a free proposal

Websites and design

Frequently asked questions

What should web design in El Paso focus on for a Juarez supplier?
Current capabilities, stated the way a buyer of the new work searches for them.
Is website design in El Paso different for an industrial supplier?
Yes. The reader may be a purchasing manager, an engineer or both, so the pages carry limits and records as well as a summary.
Is Juarez losing plants?
The Dallas Fed says the number of maquiladoras has remained steady or even increased in some sectors, even as employment fell.
How many jobs did Juarez lose?
About 57,500 maquiladora jobs from mid-2023 to mid-2025, an 18 percent loss, according to the Dallas Fed.
What kind of work is growing?
The Dallas Fed points to electrical equipment, driven by medical device and electronics operations.
Should the site still mention automotive work?
If you still do it. Say what is true today, and date older projects.
Should each press and mill get its own page?
No. Give a page to each capability a buyer searches for, not to each machine.
Can a page say a part qualifies under USMCA?
Ask a customs broker. The Dallas Fed notes that rules of origin depend on where the components come from.
What do I do with the old site’s project list?
Keep what is still accurate and add dates. Move work you no longer do to a labeled history.
What should a supplier budget for a rebuilt site?
Published US bands run from $3,000 to $25,000 for a brochure site to $15,000 to $100,000 for a custom business site. Our fixed-scope prices start at $1,400 for a landing page and $9,500 for a brochure site.
Can you come across town to see the floor?
Yes, on request. The team is based in New York and works with El Paso companies remotely.
Which six lines make a capability page complete?
The capability by name, what it does with limits, what proves it, who it fits, what to send and the next step.
How should the site handle certifications?
Name each one you hold with its number and date. Say nothing about one you do not hold.
Should the site name customers?
Only with written permission. Describe the work and the kind of product instead.
Does the site need a Spanish version?
Ask your buyers and their engineers first. If they want one, a bilingual build is on our list of services.
Should floor photos go on the site?
Yes, current and with permission, without customer marks or part numbers a customer would not want shown.
How do I show electronics work without exposing a customer?
Describe the process, the limits and the test record, and leave the customer out.
What happens to the old automotive pages?
Keep them if they are accurate, add dates and link from them to the current work.
Who approves capability claims?
A named person such as the quality manager, with a date, before the page goes live.
Can the page say what duty applies to a part?
No. Leave duty and tariff statements to a customs broker.

Got a machine list?Send your machine list, even a spreadsheet. You get a free proposal for web design in El Paso with the new capability pages listed.

Get a free proposal

Get a free marketing proposal

Tell us what you are trying to grow and we will come back with a plan, not a pitch deck. Same-day reply on weekdays.

Privacy Preferences
When you visit our website, it may store information through your browser from specific services, usually in form of cookies. Here you can change your privacy preferences. Please note that blocking some types of cookies may impact your experience on our website and the services we offer.
Contact Us