Skip to main content Scroll Top

Web Design in Boise for Daycares Now That the City No Longer Licenses Them

Updated November 2026 · Written and maintained by the Progression Agency strategy team

The City of Boise stopped licensing child care on July 1, 2025, when House Bill 243 moved licensing to the Idaho Department of Health and Welfare, and the last City facility licenses ran out on December 31, 2025. A daycare footer that still says “Licensed by the City of Boise” now points parents to an office that no longer issues licenses. Web design in Boise for a daycare fixes that line and keeps the rest in step with what the City still decides: zoning for each size of daycare, the pick-up area and the fire inspection. Progression is based in New York, builds for Boise providers remotely and visits on request.

On this page · 11 sections
  1. The City license badge still in the footer
  2. Web design in Boise for daycares after the licensing handover
  3. One daycare at five sizes
  4. The license line, rewritten for the state
  5. Pricing a daycare site in Boise
  6. Openings that never outgrow the zoning approval
  7. Drop-off directions for a daycare on a busy street
  8. Web design in Boise, ID for a daycare that moves or grows
  9. Claims a Boise daycare site leaves out
  10. The enrollment form, line by line
  11. Which Boise office answers which daycare question

No children in your care?A Boise firm with no children in its care, such as a contractor or an accountant, gets little from the daycare sizes below; our website design and development page covers that kind of site.

The dates, sizes and zoning rules on this page are stated as the City of Boise’s two daycare pages give them. Progression has no relationship with the City, the Idaho Department of Health and Welfare or IdahoSTARS, and nothing here says that any provider is licensed, rated or approved. License questions go to the Department, zoning questions to the City’s Planning team and fire inspections to Boise Fire.

A home daycare’s site carries a small badge in its footer: Licensed by the City of Boise. It was true for years. Under House Bill 243, the City says, it may no longer license childcare workers or facilities starting July 1, 2025.

A drawn card with five lines: a hypothetical footer badge, the City's statement about licensing from July 1, 2025, who processes licenses now, what a parent finds and what the footer should say.A drawn card with five lines: a hypothetical footer badge, the City's statement about licensing from July 1, 2025, who processes licenses now, what a parent finds and what the footer should say.
Illustrative example. A hypothetical footer badge beside the City’s statement about the 2025 change.

A parent who checks the badge lands on a page about the handover, and the provider looks careless without having done anything wrong. The fix is a one line change, and the rest of this page covers what else the change touches.

  • The badge is a fact that expired, not a design element.
  • Licenses now come from the state, so the line names the state agency.
  • The City still decides zoning, building permits and the pick-up area.
  • Boise Fire still inspects.

Web design in Boise for daycares after the licensing handover

The City of Boise’s Childcare Services Updates page says the Idaho Department of Health and Welfare processes all license applications and regulates licensing requirements from July 1, 2025. The City kept the Boise childcare map until June 30, 2025 and then discontinued it. The last day for new City facility applications was June 18, 2025, and City facility licenses expiring between July 1 and December 2025 were extended to December 31, 2025.

What stayed with the City is on the Requirements for Child Daycare page: zoning and land use through Planning and Development Services, and fire code inspections through the Boise Fire Department. Boise web design for this trade treats the license line as a fact to update, not a badge. The site names the licensing agency only as the provider’s own license states it, and it keeps the City for zoning questions.

  • Licensing: the Idaho Department of Health and Welfare.
  • Zoning and land use: City Planning and Development Services.
  • Building permits and the Certificate of Occupancy: the City’s Building Division.
  • Fire code inspections: the Boise Fire Department.

One daycare at five sizes

The City’s page sorts daycare into five sizes, and the state and the City name some of them differently. The table follows the City’s order and adds what each size means for the site.

The five sizes and what the site says for each
The state’s nameThe City’s nameThe City approval that appliesWhat the capacity line saysWhat the directions page covers
Family CareHome Occupation: Child Daycare, 1 to 6 childrenNone, if the home occupation standards are metUp to six childrenWhere to pull in on a busy street
Home care for seven to 12 children, described here in wordsHome Occupation: Child Daycare, 7 to 12Approval of a Zoning Compliance ReviewSeven to 12 children, only once the review is approvedThe same pick-up area, and where families wait
Center CareChild Daycare Facility, 7 to 12A Zoning Certificate or a Conditional Use Permit, depending on the zone; a Certificate of Occupancy for more than 12Seven to 12 childrenThe street the facility sits within 500 feet of
Center CareChild Daycare Center, Small, 13 to 25A Zoning Certificate or a Conditional Use Permit, and a Certificate of Occupancy13 to 25 childrenParking at one space per 10 children, with a minimum of two
Center CareChild Daycare Center, Large, 26 or moreA Zoning Certificate or a Conditional Use Permit, and a Certificate of Occupancy26 or more childrenThe sign and parking the zone allows
What a site built this way costsNot applicable.Not applicable.See the price section below.Scoped in the written proposal

Family care at home, one to six children

Boise City Code 11-03-03 allows a home daycare for one to six children without an application or a Zoning Compliance Review if it meets the standards: the use stays incidental to the home, there is one off-street space per employee, one 12 square foot attached sign that is not lit, and a valid daycare license at all times.

Seven to 12 children, at home or in a facility

At home, seven to 12 children need approval of a Zoning Compliance Review. Outside the home, a facility for seven to 12 children sits entirely within 500 feet of a collector or arterial road, as the Ada County Highway District Master Street Map shows. Home care for up to 12 needs no building permit or Certificate of Occupancy, only Planning approval.

Small and large centers

A center for 13 to 25 children or for 26 or more sits on a collector or arterial street, or within 300 feet of school grounds if it serves school age children, or in a park, community center or similar. Childcare for more than 12 children needs a Certificate of Occupancy from the Building Division.

Square feet per child behind every opening

Every size carries two numbers: at least 100 square feet of outdoor play area per child, which the code lets the City waive or modify in the cases it lists, and at least 35 square feet of indoor floor area per child. The capacity line on the site cannot promise more than those numbers allow.

The license line, rewritten for the state

One line on the homepage and one on the enrollment page name the licensing agency as the provider’s current license shows it. The line carries a date that is checked at each renewal. It does not use a City badge, and it does not link the City’s old childcare map.

  1. Open the provider’s current license and read the agency name and the dates on it.
  2. Replace the City badge with a line that states the agency and the license as shown.
  3. Remove any link to the old Boise childcare map.
  4. Set a reminder to check the line at each renewal.
  5. Send questions about state standards to the Idaho Department of Health and Welfare.

Questions about state license standards, fees and training go to the Idaho Department of Health and Welfare. The page itself states none of them.

What does the renewal paperwork look like?

For one to six children, the provider fills out a City form and presents it to the Department; no City signature is needed. For seven or more, the provider emails the top section of the form to the City, and staff confirm previous approvals and return it, which the City says takes 10 to 15 days.

Pricing a daycare site in Boise

Pricing depends on scope and is set in the written proposal, and published prices are subject to change. A daycare site is usually a brochure build with an enrollment form, a tour request and a few rule driven pages.

published US price bands (market figures, not a Progression rate card).
Type of workTypical low to published high
Landing page$1,000 to $15,000
Brochure or small business site$3,000 to $25,000
Accessibility audit and remediation$1,500 to $7,500
Site maintenance$100 to $2,500 a month
published US price bands (market figures, not a Progression rate card).published US price bands (market figures, not a Progression rate card).
Range bars for four website price bands from typical low to published high.

Progression’s prices for a daycare build

These are the fixed-scope prices on our website design and development page. Hosting and maintenance are separate.

Fixed-scope pricing on the service page
Build typePrice from
Single landing page$1,400
Restyle in place$4,800
Brochure site, 5 to 8 pages$9,500
Accessibility remediation$4,000

Openings that never outgrow the zoning approval

The City’s thresholds shape the enrollment form: one to six children at home without an application, seven to 12 at home with a Zoning Compliance Review, and a Certificate of Occupancy once a program passes 12. Website design in Boise for a growing home daycare holds the eighth spot until the review is approved.

The enrollment form caps open spots at the approved number and turns the rest into a waitlist. The capacity line reads the same on every page.

  • Open spots are counted against the approved number, not against demand.
  • The eighth child goes on a waitlist until the Zoning Compliance Review is approved.
  • The form asks the ages of the children, so the square footage per child can be checked.
  • The waitlist confirmation says no spot is held until the provider confirms one.

Where does the approval memo go?

For home occupations the City issues an approval memo that can go to IdahoSTARS as proof of compliance, and commercial facilities may use their Certificate of Occupancy. The site does not post either document.

Still showing a City license badge?Tell us your daycare’s size and where families drop off. You get a free proposal for web design in Boise, with the license line and the openings kept right.

Get a free proposal

Drop-off directions for a daycare on a busy street

A home daycare on a collector or arterial street provides an on-site pick-up area designed to ease traffic and keep vehicles from backing onto the roadway; backing in an alley is permitted. A drop-off page shows families where to pull in and where to wait.

A drawn plan of a generic lot: a home, a play yard, a pick-up area and a parking space, with a busy street along the bottom.A drawn plan of a generic lot: a home, a play yard, a pick-up area and a parking space, with a busy street along the bottom.
Illustrative example. A sketch of a hypothetical home daycare lot, not drawn to scale.

A simple drawn map does the job, with the parking line beside it. A home daycare sends the street address after a tour request rather than printing it on every page. See our daycare website design page for the rest of the build.

  • A drawn map of where to pull in and where to wait.
  • A line on the parking the daycare provides.
  • The street address sent after a tour request, for a home daycare.
  • No photographs of the house front.

Web design in Boise, ID for a daycare that moves or grows

The City still reviews zoning, building permits and fire inspections for a new center, a relocation or a renovation. The building permit application depends on the space, and the table sets out the four types the City lists.

Which building permit application fits which situation
ApplicationWhen the City uses it
528 Commercial Occupancy Evaluation RequestA name change, or new childcare in a space that was already childcare use with a Certificate of Occupancy on file and no alterations
518 Minor Tenant ImprovementExisting childcare in a space that was childcare use, with minor alterations
520 Major Tenant ImprovementChildcare in a space not previously used as childcare, or with major alterations
502 New Commercial and Commercial AdditionsNew commercial building construction for childcare use

A new location page goes live after the approvals, with the move date stated only once it is set. Fire code inspection questions go to the Boise Fire Department, and zoning questions go to the Planning team at zoninginfo@cityofboise.org or 208-608-7100.

How long do zoning approvals take?

The City describes a Zoning Certificate as a staff level approval that takes one to two months to review. A Conditional Use Permit is decided by the Planning and Zoning Commission and can take six months or more to reach a hearing. The City accepts no paper applications.

Claims a Boise daycare site leaves out

Boise web development for a daycare keeps children’s names out of captions, and a short list of claims stays off the page.

  • No City of Boise licensed or City approved wording.
  • No IdahoSTARS rating or accreditation unless the provider holds it.
  • No ratio promise the provider does not keep every day.
  • No photographs of children without written permission from their parents.
  • No child’s name in a caption.

The City’s own list of what parents should ask gives the about page its outline, and the cards below turn it into plain answers.

Ratio: Children for each adult. A parent asks how many children there are for each caregiver; the about page answers with the provider's own practice.
Training: Caregiver qualifications. Training and education of the people who care for the children, in plain words.
Turnover: How long the team has stayed. How long the provider has been at the center or in the home.
Watching: Supervision at all times. How children are supervised, including when they sleep, and how discipline works.
Safe: Health and safety training. How caregivers keep children healthy and safe from injury and illness.
Parents: Parent involvement. How parents take part in the life of the program.
Rating: Accreditation or IdahoSTARS. Stated only if the provider holds it.

The enrollment form, line by line

The form is where the City’s numbers meet a real family. It asks only what the provider needs to confirm a spot, and it never promises one.

  1. The child’s age range, so the indoor floor area per child can be checked against the approved number.
  2. The days and hours the family needs.
  3. A parent or guardian’s contact details.
  4. A tour request, with the street address sent after the provider replies.
  5. A line that says the spot is confirmed by the provider, not by the form.

Can the form take a deposit?

Yes, once the spot is confirmed and the provider has room inside the approved number. A deposit taken for a spot the provider cannot offer is a problem the site created.

Which Boise office answers which daycare question

Some questions never belong on the site. License standards, ratios and fees go to the Idaho Department of Health and Welfare. Zoning goes to City Planning. Fire inspections go to Boise Fire.

Who answers a question about a state license?

The Idaho Department of Health and Welfare. The City’s Updates page points providers to the Department for standards, training and fee information.

Who answers a question about a fire inspection?

The Boise Fire Department, which provides fire code compliance inspections. The inspection application and its fee are set out by Boise Fire.

  • State license questions: the Idaho Department of Health and Welfare.
  • Zoning and land use: City Planning and Development Services.
  • Building permit applications: the Building Division.
  • Fire code inspections: the Boise Fire Department.
  • Rating and accreditation: IdahoSTARS.

Searchers also reach Boise providers through our SEO company in Boise page and our daycare marketing page.

Websites and design

Frequently asked questions

Why does web design in Boise for a daycare start with the license line?
The City stopped licensing child care on July 1, 2025 and the Idaho Department of Health and Welfare now processes licenses, so any City license badge is out of date.
Does the City of Boise still have any say over a daycare?
Yes. It regulates zoning and land use through Planning and Development Services, and the Boise Fire Department provides fire code inspections.
How many children can a Boise home daycare care for without a City application?
One to six, if it meets the home occupation standards. Seven to 12 needs approval of a Zoning Compliance Review.
Can website design in Boise stop a home daycare from listing more openings than it may take?
Yes. The enrollment form caps open spots at the approved number and moves the rest to a waitlist.
How much space per child does the City require?
At least 35 square feet indoors and 100 square feet of outdoor play area per child, with the waiver cases the code lists. Good Boise web design keeps the capacity line consistent with that.
Does a daycare on a busy street need a pick-up area?
A home daycare on a collector or arterial street provides an on-site pick-up area that keeps cars from backing onto the road.
What does web design in Boise, ID include for a daycare opening a center?
A page for the new location that goes live after the City’s zoning and building approvals and the Boise Fire Department’s inspection.
Should website development in Boise print a home daycare’s street address?
Usually not. Send the address after a tour request rather than printing it on every page; the drop-off page explains where to pull in.
Can the site say the daycare holds an IdahoSTARS rating?
Only if it does. Boise website development for a provider never shows a rating or accreditation the provider has not earned.
What do web designers in Boise charge for a daycare site?
It depends on scope and is set in the written proposal. Published US bands run from $3,000 to $25,000 for a brochure site, and Progression’s listed prices start at $1,400.
Does Progression meet Boise providers in person, or is the work all remote?
The team is based in New York and builds remotely, and meets on site when a provider asks.
What did House Bill 243 change for Boise providers?
The City says it may no longer license childcare workers or facilities from July 1, 2025, and the Idaho Department of Health and Welfare processes all license applications.
What happened to the Boise childcare map?
The City kept it until June 30, 2025 and then discontinued it, so a site should not link to it.
Which sizes of daycare does the City list?
Home care for one to six children, home care for seven to 12, a facility for seven to 12, a small center for 13 to 25 and a large center for 26 or more.
Does a home daycare for up to 12 children need a Certificate of Occupancy?
No. The City says only Planning approval is required. Childcare for more than 12 children needs a Certificate of Occupancy.
What review time does the City give for a Boise Zoning Certificate?
The City describes it as a staff level approval that takes one to two months to review.
Can a daycare apply for City approval on paper?
No. The City accepts no paper applications; all are submitted online.
Where do state license standards and fees come from?
From the Idaho Department of Health and Welfare. This page states none of them.
Should the site show photographs of the children?
Not without written permission from their parents, and never with a child’s name in the caption.
Can a daycare site take a deposit?
Yes, once the provider has confirmed a spot inside the approved number.

Still showing a City license badge?Tell us your daycare’s size and where families drop off. You get a free proposal for web design in Boise, with the license line and the openings kept right.

Get a free proposal

Get a free marketing proposal

Tell us what you are trying to grow and we will come back with a plan, not a pitch deck. Same-day reply on weekdays.

Privacy Preferences
When you visit our website, it may store information through your browser from specific services, usually in form of cookies. Here you can change your privacy preferences. Please note that blocking some types of cookies may impact your experience on our website and the services we offer.
Contact Us